DA-HK1 Network Migration Confirmation

We will proceed with migration for server DA-HK1 on Saturday 26 October 2013 between 3am and 6am.During this time, domain names may not resolve properly as DNS servers around the world will need to update to records for the new IPs.If your domain is using a 3rd party name server, you should update your records to reflect the new IP also. This will ... Les mer »

24th Oct 2013
DA-HK1 Network Migration

We will be migrating the network for the server DA-HK1 from our older copper line to our new fiber connected back bone. As a result of the network move, the server's IPs will need to be changed.This will affect all acconts on the 202.64.188.0/24 subnet.Accounts on this server with domain using the default name servers, DNS1.HOSTHONGKONG.COM and ... Les mer »

22nd Oct 2013
Network and Power Maintenance on Sunday 7th April

Between 00:00 and 23:59 on Sunday 7th April, network and power maintenance will commence on several racks at our Fanling facility.As a result of any works done, servers within the affected racks may experience brief outages lasting between 5 and 15 minutes. During this time, servers may be shut down to facilitate works to the UPS and other ... Les mer »

6th Apr 2013
Network Upgrade Scheduled for Sundday 17th February

On Sunday 17th February, there may some network disruption lasting for approx 2 hours. We will be upgrading our network infrastructure as well as increase our total network capacity and improve overall performance.

Further details as to the time of the upgrade will be published shortly.

7th Feb 2013
Server Upgrades on CP-HK1

CP-HK1 will be undergoing minor software updates over the weekend. During the updates, the server may experience minor performance loss and short outages for reboots. We do not expect any outages to last more than 5 minutes.

3rd Jan 2013
DA-HK1 Migration Delayed

Unfortunately we have had to delay the migration of DA-HK1. We are delaying the migration to ensure that there are no compatibility errors between the old and new system. We expect to complete the migration the coming weekend (6th January).



3rd Jan 2013
DA-HK1 to be upgraded before the end of the year

Server DA-HK1, our oldest continuously running server, will be upgraded before the end of the year.The current hardware, running on a Dual Opteron 248 and 6GB DDR RAM and CentOS 5.8 is to be decommissioned before the end of the year (2012).This server has served faithfully and reliably for almost 10 years and despite its ... Les mer »

24th Dec 2012
CP-HK1 Server Upgraded

One of our older servers, CP-HK1 has been upgraded to improve it's performance and increase capacity. The server had been experiencing regular extended periods of high server load due to the older model CPU installed. This server has now been decommissioned and replaced with a more powerful quad core server with 8GB RAM. This server is ... Les mer »

16th Dec 2012
Power works complete with minimal interruption.

On Sunday 2nd December 2012, power at our building in Fanling was interrupted and not fully restored until 1am on December 3rd. The scheduled maintenance was intended to be from 10am to 5pm. Throughout this time, our onsite diesel generator provided continuous power to all servers and equipment. We have additional fuel on ... Les mer »

3rd Dec 2012
Planned maintenance in Fanling Data Centre on Sunday 2nd December

The building of which our data centre is located will have interruption to the power supply on Sunday 2nd December between 10am and 5pm.The electricity supply to our facility may be unavailable partially or completely during this entire period.Our onsite Diesel generator will continue to supply power to the servers ... Les mer »

30th Nov 2012